Use this roadmap when the reference search is pac van and the open choices are still technical. The page lists what to verify before an alternative is accepted. It is not a sustainability pledge and it is not a factory certificate.

Send Project Requirements
  1. Use
  2. Dimensions
  3. Loads
  4. Jurisdiction
  5. Quantity
  6. Destination
Annotated specification sheet for a modular building

Open choices, grouped

OccupancyOffice, storage, welfare, classroom, or a mixed camp, with headcount
Module dimensionsExternal and clear sizes, including folded and open sizes when the unit folds
Frame typeNote whether replies offer a rigid frame, cold-formed steel, or a container chassis
Bay and spanBay spacing and clear span only when the buyer is comparing steel building systems

Lists to request, not files this site stores

ForgeSource Sourcing does not host supplier manuals. Use the groups below as a request list inside the brief.

Geometry pack
  • Plan, elevation, and section for the quoted module or frame
  • Transport envelope and lifting points
  • Foundation interface sketch showing what the buyer must provide
Load and envelope pack
  • Design criteria echoed back in the supplier cover note
  • Purlin and girt spacing if secondary framing is included
  • Fire-resistance rating only if the supplier is offering one
Commercial pack
  • Included, excluded, and optional lines on one sheet
  • Currency, Incoterms or domestic delivery point, and timing assumptions
  • Change-control note for substitutions after award

Checks before an alternative is accepted

Specification still open

Volumetric modules or panelized construction?

Choose volumetric when the route and crane can take a finished box and the buyer wants more work off site. Choose panelized when packing density matters more and the site can accept a longer assembly window. Write the reason in the file.

Standard layout or project-specific engineering?

Stay with a standardized unit only when published dimensions, eave height, and options match the site. Move to custom engineering when span, load, or a local energy rule will not fit.

Acceptance test

What is compared besides the number?

Compare scope label, quantity basis, destination, and the deviation list. A shell number and a turnkey number stay in different columns even if both are printed in USD.

Who signs off the alternative?

The buyer, with the structural engineer and code reviewer they appoint. The sourcing desk can show where the replies differ. It does not stamp the design.

Request a scope check, then the quotations

Send the open items with the known items. Factories can price a clearly bounded alternative. They cannot price a brand name alone.